February 27, 2023
The basic backdrop was completed, and joints painted.
This week I worked on creature comforts, installing a refrigerator, stereo, and dispatcher’s desk.
My friend, John Garfield, came over and we completed all the prewiring which included fast clocks, Cat 6 for phone system and train order boards, 110 for outlets around the room, 3 wire system for Tortoises, and all 8 power district busses. Still have to hook up all those wires but I did label them for easy identification including the ends and the holes in the joists, so no mistakes are made mixing districts.