October 5, 2023
I finished installing 6 new switches and moving 2 more for the Gerber yard modifications. It was easy to remove track by sliding a putty knife under the ties. Caulk had been applied very thin. I still have to connect the new crossover for the trim job.
Ties have also been added under all track joiners in the yard.
Cork roadbed has been put down in Redding and joint compound ramps made coming off the main line. All the switches are installed. Now just have to add connecting track.