The Gerber engine house leads have been installed. Photo shows DAP caulk on roadbed just…
GaryApril 2, 2023
The last few days have been used putting down cork. The main yard is on…
GaryMarch 31, 2023
Today saw the completion of the Gerber Wye. I'm just beginning the East end of…
GaryMarch 25, 2023
Back on track after a wonderful visit with grandkids. My son-in-law helped me rip enough…
GaryMarch 24, 2023
I found my Tortoise jig. 3/8" holes did not allow enough movement in 3/4" plywood…
GaryMarch 14, 2023
The roll cork for Gerber was not delivered yet, so worked on Proberta instead. I…
GaryMarch 12, 2023
The plywood base for Gerber and Proberta has been screwed down to the joists and…
GaryMarch 8, 2023
A friend came over and we moved all the plywood left from the raised walkway…
GaryMarch 1, 2023
The basic backdrop was completed, and joints painted. This week I worked on creature comforts,…
GaryFebruary 27, 2023
With warm weather and little wind yesterday, 20 sheets of backdrop were painted with a…
GaryFebruary 10, 2023
A friend, Barry Gates, came over on January 27 to see the progress and stayed…
GaryFebruary 8, 2023
Laid out final 45' long benchwork, attached joists, and finished carpeting. L-girder is laid out…
GaryJanuary 20, 2023
Spent a day replacing an outside door that the contractor had done incorrectly. The 3rd…
GaryJanuary 10, 2023
Legs were place under the 45' of the Gerber Yard today. Each section of L-girder…
GaryJanuary 5, 2023
I put down more carpet until I ran out of the grey carpet needed to…
GaryJanuary 3, 2023
I have completed the framework for the two peninsulas and have propped them up against…
GaryDecember 18, 2022
I had a break on layout construction as we took a trip over Thanksgiving and…
GaryDecember 10, 2022