Skip to main content

Fascia Completed for 3 More Towns

By October 14, 2024October 15th, 2024Construction1 min read

October 14 , 2024

Great to be back out in the layout room after 6 weeks.

Sanded sheetrock mud over screws that hold up fascia and slide switch controls.

Touched up the paint and added the white bezels.

Only 1 more town and staging to go!  However, a bunch of buildings are sitting there at Redding so instead of moving them, I’m painting track and backdrop before proceeding.

Leave a Reply