Skip to main content

Starting 10 Track Staging Yard

By March 15, 2025March 21st, 2025Track1 min read

March 15, 2025

I’ve been working on getting ready to build the west end of staging yard.

I had built 2 3-way switches by just using the Fast Track’s template.  It was decided that while serviceable, they were not perfect.  I bit the bullet and ordered the expensive Fast Track jig.

My original full scale drawing was designed for FT normal 3-way jig at the west end, with a mirror image at the east end. Only wanting to buy 1 jig to build the 4 needed switches, I held the west end drawing up to the window and traced on the back side to get the needed mirror image.  I’ve made all the switches for the west end except for one 3-way and one #6 – coming soon.

Leave a Reply