Skip to main content

The Barn at Jackson Corners

By October 13, 2024October 15th, 2024Laser Structures1 min read

October 13 , 2024

After a two week vacation, I was back for just 5 days and had an emergency trip to the West Coast.  Then came down with bronchitis.  After over 6 weeks, finally back to work on the layout.  Saturday, our division had a make and take of a laser cut speeder shed.

I’d been so busy just building the layout that I hadn’t constructed any structures in over 4 years!  Dug out Bar Mills “The Barn at Jackson Corners” and started on it while watching the news.

All the needed bracing was added, then a light driftwood wash (Hunter’s Stain) was used, followed by dry brushing 2 shades of red using acrylics.  A final 50% wash of Hunter’s Westside Red was applied.

The walls are now ready for construction.

Leave a Reply